1. Preparation
-
Tools and Materials Needed:
-
Copper clad steel earth rods (threaded or plain)
-
Driving head (or driving stud)
-
Coupling (for extending rods)
-
Hammer or power driver (manual, electric, or pneumatic)
-
Earth resistance tester
-
Ground enhancement material (optional, e.g., bentonite or conductive cement)
-
-
Site Check:
2. Installation Procedure
-
Identify the location for grounding — ideally a moist, low-resistance soil area.
-
Avoid areas with rocks, debris, or underground utilities.
-
Verify soil resistivity if precise grounding resistance is required.
-
Step 1: Connect Driving Head
-
Attach the driving head to the top of the first rod to protect the copper surface during driving.
-
If threaded rods are used, screw the coupling onto the bottom end of the next rod for extension.
-
Step 2: Drive the First Rod
-
Drive the rod vertically into the ground using a hammer or mechanical driver.
-
Ensure the rod remains straight — crooked installation can reduce conductivity and mechanical stability.
-
When the first rod is nearly flush with the ground, unscrew the driving head, attach a coupling, and screw in the next rod.
-
Continue driving additional rods until the desired depth or resistance is achieved (typically 2–6 meters).
Step 3: Extend the Rod
-
When the first rod is nearly flush with the ground, unscrew the driving head, attach a coupling, and screw in the next rod.
-
Continue driving additional rods until the desired depth or resistance is achieved (typically 2–6 meters).
-
Step 4: Finish and Connect
-
Leave approximately 100–200 mm of the rod above ground for connection.
-
Attach the grounding conductor (copper tape, cable, or wire) using:
-
Clamps
-
Exothermic welding
-
Compression connectors
-
-